Release time:2019-04-08 18:15 | Article From:未知 | visits: |
The serial number |
Project units |
The name of the project |
Tower type |
Voltage level (kV) |
Quantity supplied (t) |
The contract signing date |
Delivery time |
Commission |
The owner unit references |
references |
Whether the user operation |
1 |
Fujian zhangzhou power electric co., LTD |
The water~New clubs PI after silver pond (yulan) |
Steel tube pole |
110kV |
449.288 |
2012.03.29 |
2012.5.31 |
2012.8.11 |
Mr Luo |
0596-2975385 |
yes |
2 |
Fujian electric power co., LTD |
Long wind electricityThe solitaire sea~Port of the tail lines |
Steel tube pole |
110kV |
246 |
2012.03.27 |
2012.6.17 |
2012.8.19 |
Wang Xiaojing |
0591-87024296 |
yes |
3 |
Feicheng power supply company |
feicheng110KV |
Steel tube pole |
110kV |
151.4 |
2012.05.10 |
2012.07.16 |
2012.7.20 |
Wang lei |
0538-3266023 |
yes |
4 |
Shandong electric power group company logistics service center |
Weihai rushan mountain110Kv overhead transmission Newport power transmission and transformation project project |
Steel tube pole |
110kV |
421.86 |
2012.05.09 |
2012.8.16 |
2012.10.27 |
Du Qing |
0531-80126954 |
yes |
5 |
Shandong electric power group company logistics service center |
Weifang ChangLe220Kv station the river kwai110Kv with out |
Steel tube pole |
110kV |
716.19 |
2012.5.9 |
2012.7.30 |
2012.09.04 |
Du Qing |
0531-80126950 |
yes |
6 |
Heilong |
In the new city110kVKv JiLong armour, qi YuanYi line power transmission and transformation equipment renovation project |
Steel tube pole |
110kV |
608.675 |
2012.07.27 |
2012.08.15 |
2012.10.26 |
Yang Jinping |
0452-2482172 |
yes |